S-34.1, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Full text
184. The authorization holder must send to the Minister, within the period provided for in section 100 of the Act, an end of activities report signed by an engineer including, in particular,
(1)  the completion authorization number;
(2)  the type and name of the installation, its registration number and the name of its owner;
(3)  the type of navigation equipment used;
(4)  the start and end dates of the work;
(5)  a summary of the work carried out according to their chronological order;
(6)  a summary of the abnormal meteorological conditions that caused the operation delay and the corrective measures taken;
(7)  a description of the condition of the well including a lateral section indicating the mechanical conditions of the well after the completion;
(8)  the classification of the well determined according to Schedule 1;
(9)  if applicable, a description of the type of completion carried out and its degree of recovery;
(10)  the results of the pressure and leak tests;
(11)  the intervals, the type of chemical completion, concentrations and volumes of acids and additives injected, the volume of flow-back water, injection rates and pressures;
(12)  the results of the injectivity tests;
(13)  the results of the other tests carried out;
(14)  the interpreted well logs and the results of the related analyses and studies;
(15)  if applicable, the analyses of recovered petroleum or water;
(16)  the number, interval, type and pressure of each series of perforations;
(17)  the volume of flow-back water;
(18)  a comparative analysis of the work carried out compared with that provided for in the technical program and the results obtained compared with those anticipated;
(19)  the technical reports prepared by the enterprises that carried out the work; and
(20)  if applicable, the other data collected during the completion work.
O.C. 1251-2018, s. 184.
In force: 2018-09-20
184. The authorization holder must send to the Minister, within the period provided for in section 100 of the Act, an end of activities report signed by an engineer including, in particular,
(1)  the completion authorization number;
(2)  the type and name of the installation, its registration number and the name of its owner;
(3)  the type of navigation equipment used;
(4)  the start and end dates of the work;
(5)  a summary of the work carried out according to their chronological order;
(6)  a summary of the abnormal meteorological conditions that caused the operation delay and the corrective measures taken;
(7)  a description of the condition of the well including a lateral section indicating the mechanical conditions of the well after the completion;
(8)  the classification of the well determined according to Schedule 1;
(9)  if applicable, a description of the type of completion carried out and its degree of recovery;
(10)  the results of the pressure and leak tests;
(11)  the intervals, the type of chemical completion, concentrations and volumes of acids and additives injected, the volume of flow-back water, injection rates and pressures;
(12)  the results of the injectivity tests;
(13)  the results of the other tests carried out;
(14)  the interpreted well logs and the results of the related analyses and studies;
(15)  if applicable, the analyses of recovered petroleum or water;
(16)  the number, interval, type and pressure of each series of perforations;
(17)  the volume of flow-back water;
(18)  a comparative analysis of the work carried out compared with that provided for in the technical program and the results obtained compared with those anticipated;
(19)  the technical reports prepared by the enterprises that carried out the work; and
(20)  if applicable, the other data collected during the completion work.
O.C. 1251-2018, s. 184.